Locally owned & operated in Sacramento Free, no-pressure solar quotes 25-year Tier 1 panel warranties
Call (916) 414-8393
El Dorado County

Solar company in El Dorado Hills, CA

Solar panel design, installation and service in El Dorado Hills — quoted for PG&E, permitted through El Dorado County Building Services, installed by a local crew.

  • CountyEl Dorado County
  • Electric utilityPG&E
  • Permits issued byEl Dorado County Building Services
  • ZIP codes served95762

El Dorado Hills homeowners ask us the same first question: what will it actually cost on my roof? The honest answer starts with three local facts — your utility is PG&E, your permit runs through El Dorado County Building Services, and the local housing stock has consistent patterns we can plan around.

El Dorado Hills roofs: what we typically find

Hillside custom and semi-custom homes, heavy on concrete tile, with multi-plane roofs and significant elevation change across a single property.

Hillside orientation cuts both ways here. Complex multi-plane roofs need panel-level optimisation, but the elevation often buys clean afternoon sun that valley homes do not get.

Neighbourhoods we work in across El Dorado Hills include Serrano, Blackstone, Promontory, Marble Valley, Town Center, Bass Lake — and the surrounding area within the 95762 ZIP codes.

Your utility is PG&E — which puts you under net billing

El Dorado Hills is served by PG&E, which means new solar customers fall under California’s net billing tariff (commonly called NEM 3.0). The essential point is this: power you export to the grid is credited at close to the utility’s avoided cost, not at the retail rate you pay to buy it back.

That single change reshapes how a El Dorado Hills system should be designed:

  • Self-consumption is worth far more than export. Using your own generation as it is produced beats selling it and buying it back later.
  • Storage genuinely changes the model. A battery closes the gap between the low export credit and the high evening import rate. We price systems both ways so you can see the difference rather than take our word for it.
  • Oversizing is penalised. Under the older retail-rate net metering, surplus generation banked at full value. It does not any more, so sizing to your actual usage matters more than it used to.

PG&E customers are also the ones who can access SGIP storage rebates, with substantially larger amounts for high fire-threat districts, medical baseline and income-qualified households. See our 2026 incentives guide and the utility comparison.

Permits and inspection in El Dorado Hills

Your solar permit is issued by El Dorado County Building Services. We prepare the structural and electrical drawings, submit the plan check package, respond to any corrections and coordinate the inspection. From your side the process should be invisible: you hear from us when there is something to report, not before.

Plan check turnaround varies by jurisdiction and it is the single most variable part of the schedule. It is also the reason we will not promise you a firm switch-on date before the permit is actually in hand — anyone who does is guessing.

Fire code roof access pathways and setbacks are designed into the layout from the start rather than negotiated with an inspector afterwards. That matters more on complex and steep roofs, and it is a common cause of delay on installations designed by people who do not work here often.

What we check on a El Dorado Hills site audit

  • Roof planes and orientation — pitch, azimuth and usable unshaded area on each plane.
  • A full-year shade study, measured on site. Winter shade is worse than summer shade because the sun sits far lower, and an aerial estimate will not catch it.
  • Roof age and covering. If the roof has under about seven to ten years left, we will tell you to re-roof first — removing and reinstalling an array later costs $2,000–$4,000.
  • Structural adequacy — rafter dimension, spacing, span and condition.
  • Main service panel — busbar rating and available breaker space. This is the most common cause of a quote changing after signature elsewhere, and it is entirely predictable at the audit.
  • Twelve months of your usage, read from your PG&E account, so the system is sized to what you actually consume.

What we install in El Dorado Hills

Why El Dorado Hills homeowners use a local installer

Solar is sold nationally and installed locally, and the gap between those two facts is where most bad quotes come from. A company modelling El Dorado Hills from another state does not know that your utility is PG&E, that your permit runs through El Dorado County Building Services, or what it will find when it opens up the roof. We do, because we are here.

That is not a slogan — it is the difference between a quote that holds and a quote that grows by four thousand dollars after the site audit.

Nearby areas we serve

See the full Sacramento-region service area for all 36 cities and towns, each with its own utility and permitting authority listed.

Recent work

Solar installations across the Sacramento region

Reviews

What Sacramento-area homeowners say

“Our experience was great. The team is professional, friendly and always quick to respond to any of our questions. The install crew left the place cleaner than they found it.”
Jody F.Elk Grove homeowner
“They were knowledgeable and friendly from the first visit, and solar has made a big difference in my utility bill. No pressure at any point in the process.”
Brandon S.Citrus Heights homeowner
“We looked into solar for some time but were hesitant to move forward until we met this team. They walked us through the design and the numbers until we actually understood them.”
Nicole M.Roseville homeowner
FAQ

Solar in El Dorado Hills: common questions

Which utility serves solar customers in El Dorado Hills?

PG&E. PG&E customers fall under California’s net billing tariff, where exported power is credited near avoided cost rather than at retail — which is why storage matters more on this side of the county line.

Who issues the solar permit in El Dorado Hills?

El Dorado County Building Services. We prepare and submit the structural and electrical drawings, respond to any plan check corrections and coordinate the inspection. You do not need to deal with the building department at any point.

How much does solar cost in El Dorado Hills?

Most El Dorado Hills systems land in the same regional band as the rest of the Sacramento area — roughly $2.50–$3.50 per watt installed before incentives, which for a typical 6–8 kW system means somewhere around $16,000–$28,000. Local roof types can push that either way — see the notes above on what we typically find in El Dorado Hills. Our cost guide explains what moves the number, and a free quote gives you the figure for your own roof.

Do you install solar throughout El Dorado Hills?

Yes — across Serrano, Blackstone, Promontory, Marble Valley, Town Center, Bass Lake and the surrounding area, covering 95762. We also serve Laguna, Granite Bay, Lincoln, Loomis and the wider region; see the full service area.

How long does a El Dorado Hills solar installation take?

The installation itself is usually one to three days on site. The full process — site audit, design, plan check with El Dorado County Building Services, installation, inspection and utility permission to operate — typically runs six to twelve weeks. Permit turnaround is the largest variable and it differs by jurisdiction.

Get a solar quote for your El Dorado Hills home

Modelled for PG&E, permitted through El Dorado County Building Services, installed by a local crew. Free, with no obligation.