Locally owned & operated in Sacramento Free, no-pressure solar quotes 25-year Tier 1 panel warranties
Call (916) 414-8393
Solar services

Commercial Solar Installation in the Sacramento Region

Warehouses, offices, agricultural operations and multi-tenant property — sized against your demand charges, not just your kilowatt-hours.

  • Typical scale25 kW to multi-megawatt
  • MountingRooftop, carport or ground mount
  • Key valueDemand charge reduction, not just kWh
  • Timeline3–9 months, interconnection-led

Commercial solar is a different calculation entirely

A residential system is sized against kilowatt-hours. A commercial system usually is not. For most Sacramento-area businesses a substantial share of the electricity bill is demand charges — a fee based on your highest fifteen-minute power draw in the billing period, regardless of how little you used the rest of the month. Reducing consumption and reducing peak demand are two different engineering problems, and a proposal that only models the first is only doing half the job.

What we install for commercial property

Rooftop arrays

Warehouses and light-industrial buildings across Natomas, Rancho Cordova, McClellan Park and the Power Inn corridor typically have large, flat, unshaded membrane roofs — close to ideal. Ballasted racking avoids penetrations entirely on many of them, which matters when the roof is under warranty.

Solar carports

Where roof area is limited or a roof is near end of life, parking canopies turn an existing asset into generation and shaded parking at the same time. They cost more per watt than a rooftop array and they need proper foundations and structural engineering — but for retail, healthcare and office sites the shade itself often has real commercial value, and they pair naturally with EV charging.

Ground-mounted systems

For agricultural operations and larger parcels in Wilton, Galt, Dixon and Winters, ground mounts are frequently the best answer: optimal tilt and azimuth, straightforward maintenance access and no roof involvement at all.

Agricultural solar

Irrigation pumping is one of the clearest solar cases in the Central Valley — a large, predictable, daytime-coincident load. Well pumps, cold storage and processing equipment all run hardest when the sun is up.

How the commercial economics differ

  • Demand charge reduction. Often the largest single line of value, and the one most commonly left out of a broker’s proposal. Storage frequently pays for itself here even where it would not on a residential bill.
  • Depreciation. Commercial solar is a depreciable business asset. That is a material part of the return and a genuine question for your accountant, not for us.
  • The commercial investment tax credit. Commercial and third-party-owned systems sit under a different part of the federal tax code from the residential credit that ended for homeowners after 2025, and the commercial provisions have their own rules, phase-out schedule and labour requirements. Confirm your position with a qualified tax adviser — we are installers, not accountants.
  • Interconnection scale. Larger systems face longer and more involved utility interconnection review. This is normal and it should be in the project schedule from day one, not discovered in month four.

How we scope a commercial project

  1. Interval data analysis. We request your fifteen-minute interval data from the utility and model the actual demand profile — not twelve monthly totals.
  2. Structural and roof condition assessment. Including remaining membrane life and existing roof warranty terms.
  3. Production and financial modelling. Consumption offset, demand reduction and the sensitivity of both to future rate changes.
  4. Interconnection pathway. Established early, because it usually sets the critical path.
  5. Phasing options. Where capital or roof condition argues for doing it in stages.

Sectors we work with locally

Warehousing and distribution, light manufacturing, agriculture and food processing, medical and dental practices, self-storage, car dealerships, churches and non-profits, multi-tenant retail and office property.

FAQ

Questions about commercial solar

How long does a commercial solar project take?

Longer than residential and far more variable — typically three to nine months from agreement to energisation. Utility interconnection study time is usually the critical path on anything above a few hundred kilowatts, and it should be in the schedule from the beginning.

Can solar reduce our demand charges?

Consumption charges, almost always. Demand charges, sometimes — it depends entirely on whether your peak fifteen-minute demand coincides with solar production. A refrigerated warehouse peaking at 2pm is a very different case from a bakery peaking at 4am. Adding storage lets you shave peaks that solar alone cannot reach, and this is where commercial storage often pays for itself outright.

We lease our building. Can we still install solar?

Yes, but it needs the landlord’s agreement and some thought about what happens at lease end. Options include landlord ownership with a rent adjustment, tenant ownership with a removal agreement, or a third-party ownership structure. Get it documented before engineering starts, not after.

Do you handle agricultural and pump loads?

Yes. Irrigation and well pumping across the Wilton, Galt, Dixon and Winters areas is one of the strongest solar cases in the region, because the load is large, predictable and coincides almost perfectly with production. Pump motor starting characteristics do need to be part of the design.

See what solar would actually cost on your roof.

Every quote is built from your real roof, your real shade and your real power bill — not a guess from a call centre. It is free, and there is no obligation to move forward.